Bridges

21312 30th Drive SE, Suite 110, Bothell, WA 98021 | 425.774.0106                                  © 2016 HWA GeoSciences, Inc.

  • Instagram Social Icon
  • Facebook Social Icon
Broadway Bridge Replacement

Originally constructed in 1912, the existing Broadway Bridge carries Broadway Avenue over the BNSF Railway Main Track. The design team addressed various constraints. HWA worked with the design team to develop a subsurface exploration program that would provide required soil information for various bridge replacement alternatives.